We are delighted to be involved in the maintenance programme for Shakespeare’s Globe theatre in London. Work is well under way at the landmark site, where we are undertaking ongoing maintenance to the lath and plaster walls of the building. This work follows on from Artisan being commissioned to perform a site survey to record the general condition and integrity of each individual wall panel. The surveying took place in late summer 2019 and maintenance work began in early 2020.
Further information explaining our plaster survey work at Shakespeare’s Globe is available in this case study.