The Chapel

« BACK TO ALL PROJECTS

Client: Craftworks
Architect: John Smart Architects
Location: London
Budget: £20k
Duration: 4 week
Category: Lime Plastering

« BACK TO ALL PROJECTS

lime-plaster-regency-finish
lime-plaster-ceilings4
lime-plaster-ceilings3
lime-plaster-ceilings2
lime-plaster-ceilings

The scenario
Artisan Plastercraft were commissioned to carry out a regency lime plaster finish by Craftworks to the ceilings in this renovated church.  Crafted out of the ruins of an old Chapel this wonderful family home has come to life.

What we did
Faceted plasterboards were installed to the ceiling areas and we applied a DG27 primer. We then applied 3mm 3/2 lime skim coat to plasterboard followed by 1mm skim coat of Regency lime plaster.

Award Winning
Our specialist work has been recognised as we have won the AJ Specification Awards in the “Colours and Finishes” category alongside Craftworks and Mike Wye Associates.  This project was a team effort and the end result is stunning for the client.