Coronavirus update – lockdown 2.0

Going into this second COVID-19 lockdown period we would like to assure you that Artisan Plastercraft is open for business and we continue to welcome enquiries and operate as normal. As previously, we seek professional advice, are taking steps to follow Government guidance and have measures in place to ensure the safety of staff and […]
Artisan at The Grand Hotel Birmingham

The Grand Hotel Birmingham is currently undergoing a £45million restoration and refurbishment. Artisan Plastercraft is actively involved in providing fibrous plaster restoration and replacement for ceilings and walls, as the iconic interiors are revived and enhanced to rival the finest hotels in the land. Our work includes refurbishment of the ceiling in the historic Grand […]
Rufurb Projects magazine – October 2020

The October edition of Refurb Projects includes a news feature explaining Artisan Plastercraft’s involvement in the ongoing maintenance and remedial works at Shakespeare’s Globe Theatre. The story explains how we were commissioned to undertake selective restoration of lime plaster wall panels earlier this year following our on-site survey of the building in Summer 2019. Refurb […]
Traditional lime plaster wall repairs inside Shakespeare’s Globe

In addition to the recent work on the outside walls of Shakespeare’s Globe theatre there was also maintenance to be done inside in order to repair and improve the fabric of the building. Artisan was commissioned to undertake traditional lime plaster wall repairs in the staircases and walkways inside the theatre’s North Tower and East Tower. […]